Account successfully created. Please check your inbox to verify your email id and login.
Sign in with
Sign in with GoogleAlready have an account?
Sign in
or create with
We are glad to have you onboard! But before we start we will need to make sure we’ve got the right email for you.
Go to HomepageReel Number: 221730-04
Color: Black and White
Sound: SIL
Year / Date: 1945
Country: Germany
Location: Wesel
TC Begins: 19:26:06
TC Ends: 19:31:11
Duration: 00:05:05
WWII - 1945, Construction of Rhine River Bridge, 1058 Engineer Group MS Earthmoving equipment building approaches for bridge over Rhine; bulldozers, compactors, etc. 19:26:34 LS w/ concrete pier, crane & men working - equipment in background. MCU pile-driver (?) w/ steam emitted. 19:27:10 MCU Corps of Engineer soldiers on bridge nailing bridge decking planks w/ small sledge hammers. 19:27:38 Four GIs w/ tongs carrying large plank; cutting w/ power saw. 19:27:55 Soldier on dozer backing compactor past camera. GOOD CUs. 19:28:15 Crane raising constructed large beam support framework w/ river beyond; men guide w/ ropes. Crane turning & lowering into place. View of destroyed steel bridge behind. 19:30:28 Soldiers using pneumatic hammer to nail large spikes into decking; men hammering others. 19:30:54 POV from ?? on railroad tracks past large sign: Rhine Railroad Bridge - 1058 Engineer Group. WW2 Aftermath; Reconstruction; Rebuilding Germany; 04Apr45;